MUS-666-2.00 Culvert Replacement
2LMN performed this ODOT D5 Task Order project to replace a culvert along SR 666 beneath an overhead railroad crossing. The design and construction posed a challenge with limited space to work due to the confines of the existing railroad bridge. The construction sequencing involved 5 phases and utilized both full- and split-box culvert sections. Specialized shoring was designed to support bridge abutments for live railroad loads during construction.
Services Provided
- Drainage Design
- Roadway Design
- Structural Design
- Survey
- ROW Plan Development