MUS-666-2.00 Culvert Replacement

Client: ODOT District 5

Location: Washington Township, Ohio

Estimated Construction Cost: $600,000

 

MUS-666-2.00 Culvert Replacement

2LMN performed this ODOT D5 Task Order project to replace a culvert along SR 666 beneath an overhead railroad crossing. The design and construction posed a challenge with limited space to work due to the confines of the existing railroad bridge. The construction sequencing involved 5 phases and utilized both full- and split-box culvert sections. Specialized shoring was designed to support bridge abutments for live railroad loads during construction.

 